Process-Zero for dynamic applications with automatic zero point adjustment (<30 s)
The zero point adjustment can be triggered via the PLC. If the input is pulled to <3 V, the signal is set to zero (reset) and the zero point adjustment is carried out.
The zero point adjustment is not saved permanently. This means that the zero adjustment requires a periodic “update”. Therefore, this mechanism is only suitable dynamic applications with cycle times <30 seconds.